TECHNOLOGY
Digital Construction
We record site information by block, floor, room and work item so the technical office and project management team can work from the same current records.
IN PRACTICE
Software developed in-house for the project.
A total of 595 personnel worked within ARKE’s organisation over the course of the Mandarin Oriental Etiler T2 project. Software developed specifically for this project by our IT department supported site tracking and information flow between the technical office, site teams and management.
Record progress on site. Track technical decisions against the same record.
Site teams record the location, work status and inspection notes where the work takes place. The technical office reviews these records alongside current drawings, installation details and revisions.
Software developed by ARKE YAPI’s IT department brings site information into a shared structure organised by block, floor, room and work item. Incomplete, blocked or defective work can then be tracked by location and by the activities it affects.
From site record to close-out.
Once an issue is recorded on site, technical review, follow-up decisions and close-out retain the context of the original record.
Capture on site
The location, activity and current condition are recorded on site, turning a verbal update into a project record that can be followed through.
A verbal update becomes a location-linked work record.

Check against current technical information
The site record is reviewed alongside the current drawing, installation detail and revision. The link between each technical decision and the work it affects remains clear.
The site query is linked to current technical information.

Make outstanding work visible
Incomplete, blocked or defective work is identified by location and work item. Follow-up reflects actual site conditions as well as overall progress.
The location and nature of outstanding work are clear.

Turn the decision into the next action
Following technical review, the required action is communicated to the project team. The originating site record and the work affected remain linked to the decision.
The decision leads to the next action on site.

Inspect and close out
When work is complete, inspection notes and close-out status are linked to the same record. Outstanding items are tracked through this record before handover.
Inspection and close-out complete the site record.

Digital tracking should inform the next decision.
Location and work item
Keep records tied to physical work through a shared hierarchy of block, floor, room and activity.
Current technical information
Review site records alongside the relevant drawing, detail and revision.
Outstanding work and priorities
See incomplete, blocked or defective work in its location and understand its effect on progress.
Inspection and close-out
Track quality inspections and completion within the same record chain.
Technology is part of how we deliver construction.
Site information supports decisions when its context stays intact as it passes between the technical office, project management and site teams. The aim is to make the right issue visible at the right time and follow it through to close-out.
- Capture on site
- Review the technical information
- Set priorities
- Inspect and close out
Related projects
Two data center construction references involving interdependent work packages and complex technical interfaces.

Data centers · Industrial buildings
Equinix IL2.3 Data Center
View project →
Data centers · Industrial buildings
Equinix IL2.4 Data Center
View project →Let’s review your project scope.