Projects / Data centers · Industrial buildings

Equinix IL2.4 Data Center

ARKE YAPI served as the main contractor for civil, structural and architectural (CSA) works in the IL2.4 module at Equinix’s Dudullu OSB campus. It completed structural and steel works together with partitions, seismic raised floors, waterproofing and passive firestopping.

Sectors
Data centers · Industrial buildings
Location
Dudullu OSB, Istanbul
ARKE Role
Main contractor for construction works (CSA Works)
Equinix IL2.4 Data Center main project image
Project
Equinix IL2.4 Data Center
Sectors
Data centers · Industrial buildings
Location
Dudullu OSB, Istanbul
ARKE Role
Main contractor for construction works (CSA Works)

CSA construction for the IL2.4 module.

IL2.4 is a distinct data center module within Equinix’s Istanbul campus. ARKE’s main-contractor role covered the module’s CSA construction works.

Sandwich panels, drywall, steel and raised flooring brought several building systems into one construction program. We combined design and site installation for the drywall and wayfinding packages.

Fire-resistant doors, passive firestopping and waterproofing also formed part of our construction package. These works were coordinated with the relevant structural and building-services interfaces.

Structure, partitions, flooring and protective systems.

Our main-contractor scope extended from structural and steel works to partitions, floors and protective systems within the technical spaces. We coordinated installation details and interdependent work within one site program.

  • Sandwich-panel partitions and facade systems
  • Heavy and light steelwork; structural works
  • Drywall design and installation
  • Seismic raised flooring
  • Wet trades, plastering and painting
  • Fire-resistant doors and passive firestopping
  • Waterproofing; wayfinding design and installation

THE WORK BEHIND THE PROJECT

Technical solutions and local fabrication in our Equinix experience.

Drawing on our Equinix experience, explore how our work with Mercury Engineering connected international requirements with local fabrication and construction capabilities.

Technical preparation for interdependent building systems.

Partition and facade details

Detailing sandwich panels and drywall systems around structural elements, doors and service penetrations.

Steel and structural works

Coordinating steelwork dimensions, connections and erection sequences with the structural works.

Seismic raised flooring

Confirming floor levels, support arrangements and interfaces with adjoining work before installation.

Waterproofing and firestopping

Tracking waterproofing, door and penetration details through the relevant inspection points.

Installation sequencing and interface inspections.

In data center construction, completing one activity releases space for the next. We inspect partitions, flooring and protective systems in installation sequence and track required corrections against the relevant work package.

  • Confirm details
  • Sequence the work
  • Inspect interfaces
  • Complete outstanding work
IMAGE 0101 / 09
Equinix IL2.4 Data Center main project image

Planning a project with similar requirements?

Talk to ARKE about your scope, technical interfaces and delivery objectives.