Projects / Hotels

Four Seasons Hotel Istanbul at Sultanahmet

We served as the main contractor for construction works during the renovation of Four Seasons Hotel Istanbul at Sultanahmet, coordinating the work with the historic building’s conservation requirements and hotel specifications.

Sector
Hotels
Location
Istanbul, Türkiye
ARKE scope
Main contractor for construction works
Four Seasons Hotel Istanbul at Sultanahmet main project image
Project
Four Seasons Hotel Istanbul at Sultanahmet
Sector
Hotels
Location
Istanbul, Türkiye
ARKE scope
Main contractor for construction works

Construction delivery within a historic hotel.

The renovation renewed the existing historic building for hotel use. ARKE served as the main contractor for construction works.

Existing building elements, conservation requirements and hotel specifications defined the work. Detailed workmanship was coordinated with the conditions of the existing structure.

Renovation and finishes within conservation requirements.

We planned and delivered the construction works around existing building elements and conservation requirements. Renovation details brought hotel specifications together with actual site conditions.

  • Renovation respecting historic structural elements
  • Construction under conservation requirements
  • Detailed workmanship to hotel specifications

Coordinating new work with the existing building.

Existing-condition checks

Assessing the dimensions, surfaces and connections of existing elements before developing details for new work.

Detail and material approvals

Confirming materials and junction details against specifications and conservation requirements before installation.

Protection of completed work

Sequencing activities to protect renovated surfaces from adjacent trades and site movement.

Completion and rectification

Linking inspection findings to the relevant area and work item, and tracking corrections through to handover readiness.

Handover preparation by area and detail.

Hotel renovation requires completed areas to be protected while remaining work and final inspections progress. We track outstanding items by area and coordinate rectification and reinspection with handover preparation.

  • Install
  • Inspect
  • Rectify
  • Accept / hand over
IMAGE 0101 / 12
Four Seasons Hotel Istanbul at Sultanahmet main project image

RENOVATION SCOPE

Renovation shaped by the existing building.

This project demonstrates ARKE’s main-contractor role in the renovation of a historic hotel. Conservation requirements and hotel specifications together defined the technical framework for construction.

Planning a project with similar requirements?

Talk to ARKE about your scope, technical interfaces and delivery objectives.