EXPERTISE AND METHOD / Furniture and construction coordination

Furniture decisions start while construction is under way.

Construction and furniture manufacture are interdependent parts of the same delivery. Wall dimensions, finish thicknesses, concealed backing and service points directly affect production and installation. ARKE resolves these interfaces with its manufacturing partners during the build.

The scope we can undertake
Completed architectural and technical works inside Pullman Hotel
Pullman İstanbul

A cabinet fitting correctly starts with site information.

If a manufacturer’s drawing differs from the finished wall, the issue may only become visible on installation day. We review architectural and furniture information against shared dimensional references and exchange the site measurements and finish information needed for production.

Preparing fixings before the wall is closed.

A wall-mounted cabinet or panel needs the appropriate backing in the right position and at the right stage. Furniture fixing needs are considered alongside wall construction and service points. This preparation reduces the risk of reopening finished surfaces during installation.

A coordinated responsibility structure for the client.

We work with established furniture manufacturers within a shared programme. The readiness of installation areas, the timing of production and outstanding decisions are considered together. The client can progress through a defined coordination structure between construction and furniture teams.

COORDINATION IN PRACTICE

Details resolved before furniture installation

Explore how dimensions, backing and service locations are coordinated in five stages.

SCOPE

The scope we can undertake

  • Architectural and furniture dimension/detail coordination
  • Preparation of concealed backing, connections and service points
  • Samples and production decisions linked to the site programme
  • Coordination of delivery, area readiness, installation and protection

DELIVERY METHOD

How we work

  1. Establish shared drawing and dimension references
  2. Complete required preparations before walls and ceilings are enclosed
  3. Base production decisions on current site conditions
  4. Match area readiness to delivery
  5. Install and inspect

Let’s discuss your project.

Share the project for which you would like construction and furniture delivered within one programme.