PROJECT EXPERIENCE / Turkcell data centers

Turkcell Data Centres: a technical solution that grew into complete building works packages.

Our relationship began with seismic suspended ceilings at Turkcell’s İzmir data centre and continued through AvDC and the GEM4 and GEM5 modules. The scope grew from a specialist system to responsibility for the full building and architectural works package on later modules.

Capabilities demonstrated by this experience
Turkcell GEM5 Data Center main project image
Turkcell GEM5

GROWING RESPONSIBILITY

From one technical solution to a full building and architectural works package.

The relationship established on the first delivery continued across later projects, with an expanding scope of work.

  1. IzmirSeismic suspended ceilings
  2. AvDCSeismic ceilings, dry partitions and acoustic finishes
  3. GEM4The full building and architectural works package
  4. GEM5Continuing the relationship with the same scope

İzmir: from system requirements to sourcing alternatives.

We studied the seismic ceiling requirements and relevant technical documents in detail, reviewing components, connections and installation needs. Alongside alternative supply options, we worked with local manufacturers and contributed to component design and production. The work connected technical requirements with product availability.

AvDC: a continuing relationship and broader scope.

ARKE’s work on Turkcell projects continued at AvDC despite a change in the main contractor. Dry partitions and acoustic timber ceiling and wall finishes were added to the seismic ceiling scope, extending the relationship into further architectural packages.

GEM4 and GEM5: responsibility for the full building works package.

On GEM4, our scope expanded to the full building and architectural works package. We undertook the same scope on the subsequent GEM5 module. The working relationship with the project parties allowed technical and site delivery experience to develop into greater responsibility.

Translating airflow requirements into architectural components.

On GEM5, requirements from the project’s CFD analysis informed perforated plenum panels, airflow guides at corners and variable-angle louvres. We also reviewed seismic ceiling panel details in relation to installation and the effects of air movement. Translating technical inputs into fabrication geometry and installation details was central to this work.

SCOPE

Capabilities demonstrated by this experience

  • İzmir: seismic suspended ceilings, technical research and alternative sourcing/local manufacturing development
  • AvDC: seismic ceilings, dry partitions and acoustic timber ceiling and wall finishes
  • GEM4: the full building and architectural works package
  • GEM5: the full building and architectural works package, including bespoke technical architectural components

DELIVERY METHOD

How we work

  1. Review system and specification requirements
  2. Develop procurement and local manufacturing options
  3. Coordinate site installation and technical details
  4. Carry a broader scope into subsequent phases

Let’s discuss your project.

Share your data centre construction and bespoke fabrication scope. We will help translate the requirements into workable solutions.